Wasn't sure where to put these. We got to tour the crawler that carries the shuttle to the launch pad. Once the the shuttle is launched they re-furbish the moblil launch platform and bring it back to the vertical assembly building. Our load test got rained out for the day so we took a tour of the crawler as they were bringing the platform back to the VAB.

Replies11
  1. #1JDOFMEMI2010-10-01 13:26

    That's great. I would love to see it someday. Wonder what the future holds for the transporter after the demise of the shuttle program?

  2. #2heavylift2010-10-01 22:14

    looks like a playskool steering wheel nice pics

  3. #3amtronic2010-10-02 11:03

    We took the tour a few years ago, when we got off the bus outside the VAB one old guy looked up and just went right over backwards.

  4. #4heavylift2010-10-02 14:37

    Probably sold for scrap ...1 dollar

  5. #5kanewolf2010-10-02 15:39

    The crawler is supposed to soldier on supporting future launch vehicles. http://en.wikipedia.org/wiki/Crawler-transporter

  6. #6heavylift2010-10-02 20:56

    got to love the fuel mileage ... 150 gallons per mile

  7. #7OCR2010-10-03 02:31

    Crawler Ride: Man... Grandpa's sure lucky he didn't hit the back of his head, on the concrete. Ahhhh..... or..... did he???... :tong ← :lmao OCR...

  8. #8DirtHauler2010-10-03 21:47

    I had the chance to see it in person, its really a marval.

  9. #9powerjoke2010-10-03 22:13

    Haha, maybe it's got a PowerStroke in it lol. I seen it on TV a couple times and they said that they had the roadway all asphalt and then they were wearing the track pads too fast so they went to gravel......Did I get that story right???? Pj

  10. #10DirtHauler2010-10-04 05:53

    NASA report on the reason for the design http://www.hq.nasa.gov/pao/History/SP-4204/ch11-6.html http://www.hq.nasa.gov/office/pao/History/SP-4204/ch15-5.html http://www.hq.nasa.gov/office/pao/History/SP-4204/ch13-1.html

  11. #11Bullpuncher2010-10-04 12:35

    Actually its got 2 16 cylinder ALCO Diesels with DC Generators to power the tracks and 2 big V-8 Detroit AC generators to power all the subsystems. On the gravel, one theory is to place a substrate thats really hard and can't be worn out, but because the crawler doesn't have a suspension then the vibrations from all of the pads slapping the ground migrate up through what ever it was carriing ( spelling) and cause it to move around quite abit. The degration of the gravel as the crawler travels over it acts as a suspension of sorts, reducing the virbrations and making the 8 hour 3 mile trip to the pad a little easier on the guys that run it.