Hi everyone, Would anybody know what kind production you can expect from a Deere 850 c size dozer? We are looking at doing a lagoon that will end up being about 16 ft in depth, how many yards per hour would a safe average estimate? We are working in clay no rock or sand.
Not sure how many yards per hour, but an 850C will move a lot of dirt quickly with a semi u blade and can easily do your project timely. I have a 750C and with a 10’ semi u blade full, it is approx 5 1/2 yards - I would not hesitate to do the job with it at all
Would $1.30 / cubic yard be a reasonable rate?
16 ft deep ? what are length and width ? If you are at a buck 30 you enjoy while you can .
lagoon will be 500' x 100'
Bottom or top?
Bottom, sloped up at a 2:1 slope