Hello all, We are trying to decide between these two pieces of equipment. Are there any studies about how many acres per hour these machines can rip 6 to 7 feet off the ground? Any published work or range would be appreciated. Thanks.
I worked on an excavation job where a 455 and a D11 were ripping and stacking. There was noway the 11 could keep up either ripping or pushing. The operators swapped machines for a day but the result was the same.