laying a pipe w/komatsu 400

reddot556 ยท 2008-10-21 20:22

to me its the best and smoothest machine to lay pipe with

Replies16
  1. #1chris-law2008-10-22 08:49

    not the best way to place a pipe into position by slewing , you have more control placing it with boom and dipper square on .... thats just my opinion though

  2. #2reddot5562008-10-22 20:05

    lol..thats my preferred method too but you dont see the fire hydrant to my right that prevented me from doing that..after we laid 4 pipe i continued to dig the ditch but it will be no-joint instead of precast

  3. #3cat 3852008-10-22 21:59

    hey mad max the divider in the bucket, is that for support because of the width? does clay get stuck in the bucket? very intresting.

  4. #4CascadeScaper2008-10-22 22:01

    Good pics, I like dash 7 PC400's. Spent a little time in a couple and I have no complaints.

  5. #5bigblueox2008-10-23 00:00

    :falldownlaugh:falldownlaugh:lmao man he does have some crazy buckets

  6. #6RonG2008-10-23 04:13

    Is that bucket a little snaggletooth????Looks like a couple of caps missing there? Could be just soil covering the shanks though as I cannot see it clearly. You sure do nice looking work,everything is clean and straight. I get the fever when I see nice work like that,it's tough to get old!!Ron G

  7. #7brandt pc4002008-10-23 13:15

    That's what i'm talking about. Best machine ever :notworthy

  8. #8biggixxerjim2008-10-23 13:57

    shouldnt that pipe be picked up by a cable AND a bar???

  9. #9cat 3852008-10-23 19:04

    looks fine to me, it's a pipe choker,heck it's even rigged right(spigot heavy)

  10. #10CheeseHead2008-10-23 19:24

    I have to get with the times here, I've never seen a bucket like that before.

  11. #11cat 3852008-10-23 19:29

    check out his other threads,that's why i call him mad max

  12. #12reddot5562008-10-23 20:34

    cat385...yep, the divider is to keep the bucket round RonG..yep, theres a few teeth missing but you just can't seem to make my "laborer" foreman understand these things we only had a 100 or so feet of the 54" to pour today...notice the ground water in the ditch? the propeller heads took out our de-watering the week before, after we finished the sewer..they forgot about the storm drain..yeeesh!!!:Banghead

  13. #13gmads012008-10-23 21:59

    Maybe the propeller heads thought that with water in the ditch, you'd at least know that the ditch was falling the right way .

  14. #14rino14942008-10-24 05:55

    Just pour the concrete stiffer....lol

  15. #15brandt pc4002008-10-25 09:55

    how meney hrs on the 400? and how much 54'' pipe can you lay in a 10 hr day?

  16. #16dirthog282008-10-25 21:50

    How are you digging the top part of the trench that is sloped back? Looks like paddle teeth on a tilt bucket, that round bucket won't do that will it? And also what's that yellow sled looking thing that's rounded on bottom and fits perfectly into your trench?