We got a pretty good sized tight sheeting job on the banks of a northern Michigan river. The site of an old fuel station that leaked into the ground for 30 years. We’ll drive 30’-50’ tall sheet pile, remove 10-20 feet of soil, and backfill with clean sand.
Old guy runs the link belt 418, I run the terex hc 110 but I do get plenty of time in the old friction crawlers too. More than I care for haha
cool It's been an age since I messed with sheet. Thanks for posting