This link shows a Lampson Transilift (i believe it was one of their 1500 toner) lifting a roof section for a new stadium back east. The lift was 400+ tons on the jib (yea its a big crane) and was considered a critical lift due to the radius and load weight. The operator that was tasked with making the lift refused it due to the winds (note the wind sock in the top right corner of the vid). The Project Manager said fi
Discuss this in the forum topic Crane Accident.