hi sorry if I ask this question, you would have material photos or information on large Concrete mixers on I loom large trucks have told me that for large works like dams, bridges and other works using concrete mixers mounted on frames of mining dump trucks, we know nothing, thanks to who will want to answer http://www.blackwellgroup.co.uk/images/bell.jpg

Replies13
  1. #1RonG2016-01-20 08:44

    For a large structure like a dam I would think a central mix plant and a large crane with a concrete bucket would be most efficient.You sure have some nice looking truck mixers there though but I don't think you could haul very much payload with our DOT in this country.Those 12cy mixers are pretty top heavy with a full load.Ron G

  2. #2trombeur2016-01-21 01:53

    Thanks for your opinion and your intervention, for every job properly as you say you take the right equipment to the next

  3. #3RonG2016-01-21 03:52

    The last picture of the front discharge mixer is the configuration that is taking over our country these days,well,for the last 30 years really but they are are state of the art in the USA.That looks like an "Advance" brand mixer but it seems as though there are many brands out there and all the big guys have tried it. The driver does everything,all he needs is someone to sign the ticket.Ron G

  4. #4td25c2016-01-21 22:00

    Interesting mixer tucks trombeur. The front discharge mixer was a gift from the concrete god's to the contractor . Very agile in tight areas & soft ground . Good driver will put the mud rite where you need it without effort . I am a little partial to the FWD you posted . A little noisy but they get the job done . http://www.heavytruckforums.com/showthread.php?51-Fwd-Trucks&p=1251&viewfull=1#post1251 Other tasks where it's not practical to get a big truck in the single wheel mixer truck works best . HeavyEquipmentForums Hang on a second .... That crew looks familiar

  5. #5trombeur2016-01-22 03:33

    thanks to our work and your experiences, can you tell me other concrete mixer all terrain also tracked crawler or special?

  6. #6RonG2016-01-22 04:17

    I have never seen a tracked mixer before but the concrete pump will earn its keep and is quite portable.As you know it is important to plan ahead as there are no second chances in your trade.Ron G

  7. #7trombeur2016-01-23 02:10

    thank you for your testimony and opinion, however, for the record the mixer tracked all terrain is built by a Korean firm, I was also the first time I see one, as you rightly say one gets ready based on the work to be performed, to next http://autoction.com/news/company-news/579-all-terrain-concrete-mixer http://www.bsl-machinery.com/what-do-you-need-to-know-about-merlo-self-loading-concrete-mixers/ http://www.bsl-machinery.com/how-self-loading-concrete-mixers-work/

  8. #8sinotepmachinery2017-07-06 00:27

    Established in 2005, Taian Sinotep Machinery Co., Ltd (SINOTEP) is a professional trailer mounted concrete pump (stationary concrete pump) manufacturer in Tai’an city (World Natural & Culture Heritage and Most famous China Mountain ‘ Mount Tai ‘ is located here), Shandong Province, China. With 20 million USD total assets and more than 100 employees, SINOTEP has the production capacity more than 1500 units concrete pumps per year. SINOTEP has a 8,000 square meters modern workshop and parts house. Taian Sinotep Machinery Co., Ltd Address: Liyuan Village, Xiazhang Town, Daiyue District,Tai’an City, Shandong Province, China Tel: +0086-538-2068183 Fax: +0086-538-2068183 Whatsapp/Wechat: +0086-18854883534 MSN: [email protected] Skype: app_paper Email: [email protected] Website: www.chinatrailerpump.com

  9. #9sinotepmachinery2017-07-06 00:32

    Company catalog of Taian Sinotep Machinery Co.,ltd https://www.chinatrailerpump.com/download/

  10. #10trombeur2017-07-06 04:15

    Thank you for reporting if you have news, I invite you to participate in the discussion, thank you again

  11. #11DMiller2017-07-11 10:28

    Have to mind slump with the pumps, too dry and will rock up the plumbing or fail to feed thru the pump. Watched four Brand New pump sets destroyed working Nuke site where they 'Had to have a harsh dry 3" slump' that did not work, they moved to 5" then 6" to get the continuous pour done.

  12. #12trombeur2017-07-13 05:18

    Grazie per i giusti suggerimenti e preziosi consigli. Una domanda se riesco a pompare Wortington, sono stati acquisiti da putzmeister? AUTOCARRO FIAT 697 CON POMPA CLS WORTHINGTON SU FIAT 697 PER ESTERNO AUTOPOMPA PUTZMEISTER AZ24 -100 PER CLS

  13. #13trombeur2018-03-21 04:10

    Esaustive, da parte mia quando è stato un grande sito era stato predisposto per affrontare il problema con l'area della piazza dove si accumulano le ghiaie ghiaia ghiaia ghiaia un silos per contenere il cemento, il serbatoio per per quanto riguarda la portata, è stata trasportata e sollevata per mezzo di una gru a torre, ma oggi è confezionata in impianti e in impianti di betonaggio che sono di solito vicino a una caverna di aggregati o fiumi da cui viene estratto il materiale inerte necessario per fare il calcestruzzo, come credo sia giusto? http://static.multipino.it/photoOffer/big/621798_big.jpg http://www.mev-srl.it/prodotti/impianti/impianti-raggio/impianto-braccio-raschiante/ http://www.mev-srl.it/prodotti/impianti/impianti-raggio/impianto-braccio-raschiante/ http://www.officinepiccini.it/