Hello, I am a crane operator but I mainly have experience with older 118 friction cranes. The lift that we have to make cannot be done with a friction rig so I just had a Linkbelt 218 crawler crane delivered and assembled but it was not ever taken out of rigging mode or put in operational mode. Can anyone point me in the right direction on how exactly this is done?
No replies yet.