This 9 minute video features cameras mounted in the cab, under the main chassis, on the block and at the point of delivery. The Chelsea Street Bridge is a $125-million vertical lift bridge with a 450-foot span and a 175-foot clear height at full lift. On December 13th, 2010 two 18 foot diameter sheaves arrived in a two part transport by rail and barge from Florida. Unloaded in a horizontal position they were tripped
Discuss this in the forum topic Hallamore's Terex/Demag CC2800 w/Luffer **in-cab-video**.