Heavy Equipment Forums

Building the Chelsea Street Bridge - Sheave Lift

Building the Chelsea Street Bridge - Sheave Lift

This 9 minute video features cameras mounted in the cab, under the main chassis, on the block and at the point of delivery. The Chelsea Street Bridge is a $125-million vertical lift bridge with a 450-foot span and a 175-foot clear height at full lift. On December 13th, 2010 two 18 foot diameter sheaves arrived in a two part transport by rail and barge from Florida. Unloaded in a horizontal position they were tripped

Discuss this in the forum topic Hallamore's Terex/Demag CC2800 w/Luffer **in-cab-video**.

Video details
  • ChannelStephen SetteDucati
  • BoardCranes
  • SharedDecember 25, 2010
  • Thread replies4
Browse videos