Cat D10t pushin'

Cat D10t pushin'

Pictures are fun, but so are videos.. This particular time, the 10 was pushing two blade fulls down to the end of his slot, where there was already another pile. There had been a grading change, so they had to build out the slope, hence the D8t sitting at the end of the pile. On an average day, the operator was moving 2500 yards a day in a 9 hour shift. This included the time required to clean up windrows.

Discuss this in the forum topic The lost art of slot dozing!.