I was just curious to know what are some of the real world hourly tonnage rates you guys are getting on a CAT 992gs in limestone.
On our 6.2 mile roundtrip haul... 1100 ton per hour. That's with (4) 100 ton trucks on a 3.1 mile downhill haul and a 1700 ft elevation drop. our other pit is 1.5 miles from the dumphopper and the 992G will max out the tonnage and trucks are waiting on the crusher... 1300 tph It all varies though, on the operator, the road conditions and the weather.