Here are a few shots of the LE addition from the early 90's I was running the35t Grove. The 18t Link-belt was the standard will do everything crane. Which the office failed to notice you need a two line machine to roll the panels.

Replies13
  1. #1td25c2009-12-31 19:01

    Look's interesting heavylift.Looks like they had to haul the panals on the lowboy in the uprite position to keep from cracking.Were they very hard to rigg?Use nylon straps,endless loops?

  2. #2heavylift2009-12-31 19:24

    theses panels are the heavy ones that we used two cranes to roll.. they have a eye clamp thing in 4 places ... two on the top.. and two on the right edge which is actually the top. You use a snatch block on both lines Upside down, This allows the cables to rotate as the panel turns 90 degrees..sorry for the poor quality jerry rig scans I was using the grove most of the time to lift all the panels in place. It's not that there TOO heavy... but the knock down drag out whos the boss fight... turned into the panels are TOO big ...thus the 2 cranes... The equipment super won... I look see if i have a pic of the rigging

  3. #3td25c2009-12-31 21:15

    Is the "eye clamp" cast in the panel or is it a removable tool made for the panels?I was never around those jobs.Interesting.Looks like the grove has two drums.I guess you could have done the whole job with it if the boss would allow it.cool pics.

  4. #4heavylift2009-12-31 22:00

    http://67.192.65.138/weavecmsresources//Accessory_Handbooks/PDFs/Precast_Handbook.pdf Thats a link to the hardware... page 22 It's kinda like those clasps on a necklace. the one you have to pull and rotate to open The snatch block isn't upside down . But is was probably a 30t block on both lines. the whip line was two-parted with a snatch block under the ball. the main is 4-parted with a snatch block under the hook it had one choker run thru the snatch block... swift type hooks shackled to each eye of the choker... i would lift the panel of the trailer then it would pull out.. with both winches... then when it was 5 or 10 feet above the ground ... these panels in this photo are backwards now .. due to the 2 cranes... But you would pick with the main and the choker would move around the block. once you had it vertical . they would unhook the whip line. they are laying flat just to transport.... to tall to stand upright

  5. #5heavylift2009-12-31 22:15

    as you can see the precast is about finished ... this is probably the first day with 2 cranes.... It all started because we used the jib. during the floor phase to set rebar on the decking. They had a NO JIB policy.... the grove is in their rental fleet .. LB is in company fleet thus it doesn't have a jib.... that was several months earlier...for the decking Then belger was there one day putting new air handers on the old part on the building... the super kinda implied that they hired the crane to set rebar. which he didn't.... insert pot stirring smilie the equipment super would drive by the job at least once a day

  6. #6td25c2009-12-31 22:55

    Thanks for the link heavylift,I see how it works,pretty cool.Dayton Superior was big into concrete pre-cast & form systems.I still use the "gates" type system on poured walls,snap ties,3/4 plywood ,& 2 x 4 whalers.It's all in the Dayton Superior handbook.

  7. #7heavylift2009-12-31 23:03

    I looked at the pics again... the linkbelt isn't level yet... plus there's no rigging on the block... so my best guess is.... this is the first panel for 2 cranes

  8. #8liebherr11602010-01-01 22:46

    Nice pic's .. Didnt have a second hoist on the Grove to flip the panel's ..But im thinking if it did it was only a smal winch (9/16) line..Though having two machines is a lot nicer when it comes down to it .. Using a 60 T truck mount and variuos R'T's using both winches I flipped panels on my own ..even stood a 80ft silo once with just one machine and allot of planning ..

  9. #9heavylift2010-01-02 00:11

    The Grove has two winches... and we set the majority of the panels with the Grove. I would even say 98% . I think the panels were 10,000 pounds. There were a couple of 18,000 pound panels at the start of the job, that we used the 2 cranes. This panel is going to be placed in the opening behind the counterweight in the 3rd picture..

  10. #10liebherr11602010-01-02 06:05

    9 ton panel on that lil Grove is a good lift ..no question .. I do enjoy a go of precast ..

  11. #11heavylift2010-01-02 14:26

    This is the tip of the Grove... the rigging is gone... so My guess is we lost the war with the equipment super As for the capacity of the whip... can't recall... but we used 2 cranes for the 18,000 pound panels...it must have exceeded the whips rating.... because it's more or less picked off the trailer with the whip and helped with the main. But the main starts taking it after the turning starts Judging by the gaps in the building, we are setting replacement panels... for the ones damaged in transit

  12. #12liebherr11602010-01-02 16:23

    Here's a little Grove RT 700E ..that was working up the road from where I live ..niffty little attachment for flipping precast ..

  13. #13Billy Big Rig2010-01-04 22:45

    Nice little steel job in the making .reminds me of the Herrick job I hung iron for with Mr.cranes LR 1300 w/170 main & 160 luffer, could set a 10T header @ 190' out, last year at Santa Barbaras Cottage Hospital